We welcome as members individuals and organisations who care for Hammersmith
As a Member, you will receive regular updates outlining our activities, giving you the opportunity to participate in consultations and campaigns. We'll invite you to our Awards Evening and AGM, and other events. Members are always encouraged to take an active part in the work done by the committee – come along and see if you can help.
The membership year runs from 1st Jan, and only costs £6 for individuals, £8 for couples or families, and £15 for organisations. Additional voluntary donations always welcome.
Town Hall January 2018
We have been advised that there will be an exhibition in the Town Hall to update progress on the scheme. There are two dates for these which are Thursday 1st February (4pm to 8pm) and Saturday 3rd February (10am to 2pm) – as shown in the society diary (right)
We hope that you will be able to get to one or other of these dates, and we would be pleased to hear any feedback.

The decision follows work by the Council’s Parks Commission set up last year and the Council’s pledge to protect open spaces from being sold off. Each of the main parks in the Borough had resident representatives on the Commission.
We have been pressing the Council – so far unsuccessfully – for us to be involved in decisions regarding the refurbishment of the bridge which is due to take place later this year. As you will all be aware, the bridge is in need of strengthening so that it can support the weight of double decker buses and some lorries.
This a joint project between Transport for London and the Council who have responsibility for the maintenance of the bridge. Several short term closures have been necessary for temporary works and we understand further closures are necessary to allow detail survey work to be carried out. There still does not seem to be a formal programme for the main works. For obvious reasons we do not expect to be involved in the technical detail and our main interest is in the lighting and redecoration. Since the last lighting upgrade for which the Hammersmith Society gave its Environment Award in 2000 for the ‘blades of light’ created on each side of the bridge, lighting technology has moved on in leaps and bounds so that the individual incandescent bulbs will almost certainly be replaced by strips of modern LEDs.
Continued →
As reported in my last News Update, another Listed building to be refurbished is the main auditorium at the Lyric.
We were recently invited, together with members of the Historic Buildings Group, to look at proposals for the larger of the DIMCO buildings, the only Listed buildings remaining on site. This one is currently used by Transport for London for storing buses but come the completion of Phase 2 there will be a purpose built facility allowing the freeing up of the Listed shed. The current proposals, still at an early stage, are to convert the building into an entrainment/event venue. Although the the scheme involves inserting of a full mezzanine floor, none of the original fabric will be damaged so that all the interventions will be reversible. We liked the proposals in principle and our concerns were mainly centred on access and egress of up to 3000 people and the capacity of the adjoining streets and public transport system to cope with the potential surge of visitors.
Also in White City we were recently given a presentation of proposals for Centre House. On the site are the rather tired 1960’s buildings on the east side of Wood Lane opposite to old BBC tv centre. The buildings were all used as part of the BBC facility including prop storage, scene building and their engineering department. First sold to Helical Bar, then Imperial College, they will now transfer the site to St James who will develop approximately 520 units of housing, much of it for rent and specifically graduate accommodation for Imperial. It is another large scheme, mainly linear blocks of 9 storeys with a possible towers of 21 and 31 storeys. The architectural treatment has been well considered.
The landscape proposals are potentially excellent although there is limited private or public amenity space. Many of our concerns about scale, height and density and reduced open space have already been eclipsed by decisions already made on White City.
Continued →
Proposals for the adjacent site at 66 Hammersmith Road have now come forward as an application. (Ref 2017/04752/FUL).
We are concerned at the excessive bulk of this building and the adverse effect which it would have on the Listed buildings and Conservation Areas nearby. You can read our response to the application as attached.
Hopefully many of you were able to get to the consultations/exhibition on the new scheme. Reactions from members seemed generally positive.
Continued →
Continued →
Now that the Lyric have completed the latest round of expansion and building works, they are looking to overhaul the main auditorium and studio spaces. They have asked us to be involved in consultations which will commence in the New Year. This is obviously important to the Hammersmith Society which played such an important role in saving the theatre from destruction back in the 1970s.
The 12-page October Newsletter has been published and circulated to subscribing members. Subjects include:
All newsletters that are available to download can be found here
One news item from each selected source – more on our Local and Affiliate news page. Subscribe to our weekly highlights


Campaigning for over sixty years