We welcome as members individuals and organisations who care for Hammersmith
As a Member, you will receive regular updates outlining our activities, giving you the opportunity to participate in consultations and campaigns. We'll invite you to our Awards Evening and AGM, and other events. Members are always encouraged to take an active part in the work done by the committee – come along and see if you can help.
The membership year runs from 1st Jan, and only costs £6 for individuals, £8 for couples or families, and £15 for organisations. Additional voluntary donations always welcome.
We’re intrigued by the possibility of a linear park or alternative use for the disused part of the District Line viaduct between the Kings Mall flats and the new Sovereign Court, as proposed by Hammersmith BID and West London Link (known for the Flyunder concept) as part of the London Festival of Architecture 2019. Inspired by the New York highline and the Promenade Plantée in Paris that preceded it, there’s a competition open for ideas – details here. The project has it’s own Twitter page, where you can follow progress.
Given the challenges of the location and some of the similarities, we’re attracted to the new tropical roof garden above the Crossrail station at Canary Wharf as a source of inspiration, but the site will lend itself to many interpretations, so do please take part if you have ideas.
Several committee members attended the latest Heathrow Consultation held on 24th Jan. A more detailed article will appear in the next Newsletter, but in the meantime the essential take-aways are summarised in the graphic shown, short-cutting the 26 consultation documents.
This shows one of the most problematic proposed new arrivals flight paths “Arrivals-1 for the Northern runway” (used 75% of the time for early mornings), overlaid with a “heat map” of the Society’s membership. Make no mistake, the majority of members would be directly overflown at 2000-3000ft. The “Arrivals-2” option is worse for some members, with overflights between 2000-2500ft in the southern part of Hammersmith.
We urge you to respond to the online questionnaire answering “neither – prefer no expansion” to most questions, or use appropriate detailed responses largely the same as Chiswick’s, see: http://chatr.org.uk. You must do this by 4th March.
Currently, no Hammersmith residents are directly overflown, and those living North of King Street (the majority of our members) hear rather less of the early morning arrivals along the river that plague those living further South, particularly in TEAM mode between 6-7am as described here.
Continued →
TfL has issued its response to previous consultations on the cycle route from Kensington Olympia through Hammersmith and Chiswick, and says construction of the route on the north side of the Hammersmith Broadway gyratory will begin this year.
There are no substantial alterations to the section from Hammersmith Broadway to the end of King Street. Local criticism had centred on the congestion of traffic and pedestrians, and the likely delays for buses if the roadway is narrowed at the east end of King Street to make space for a segregated two-way cycle lane: TfL says delivery vehicles will use parking bays or park in Blacks Road or Angel Walk. We are sceptical as to whether that message will get through to security service vans delivering to banks, for example.
There were also worries about increased risk to pedestrians from cyclists. TfL has decided to drop the term “Super-Highway”, saying it sends the wrong message. A local family cycling group has welcomed the scheme, so let’s not forget it is not just fast commuter cyclists who want cycle lanes. But the TfL report specifically excludes the option of a commuter route parallel to the length of the A4, and is vague about the prospect of a fast route in Hammersmith, which the Council announced last month.
We understand LBHF is having further discussions with TfL.
A number of exhibitions are being held across the borough this month concerning the design of the HS2 station at Old Oak, which is at the heart of the OPDC area. This is the major interchange between HS2 and The Elizabeth Line (Crossrail), due to be the busiest interchange in the UK after London Waterloo.
The architects are WilkinsonEyre and let us hope they come up with a design which measures up to the importance of the project.
Details of times and locations are shown in the diary with links to maps – the first event is today, 5th February.
The revised, and likely final Town Hall plans, filed under ref. 2018/01500/FUL, are being exhibited this Friday 4-8pm and Saturday 10am-2pm – details in our diary. You are doubtless familiar with the project’s development over the years, and the changes brought about after consultation with members of the public, the volunteer Town Hall Commissioners, this Society, and Historic England.
The following significant changes are listed:
In the invitation (full details), the leader of the council says:
We propose to demolish the ugly Town Hall extension and bring Hammersmith:
Continued →
An exhibition of plans for a new development on the site of the former Hammersmith Magistrate’s Court is being held on Friday 23 November 3-6pm, and Saturday 24 November 12-3 pm at the adjacent Lila Huset Professional Centre, 191 Talgarth Road W6 8BJ.
This site is between the Ark/Lila Huset and the Talgarth Road BP garage as shown. The planning consultants say: “The proposals include two complimentary hotels which will bring with them significant community benefits. The site has potential to deliver a significant number of jobs, community meeting space, rehearsal space for local performing arts groups, a rooftop bar and terrace, the largest living green wall in London, affordable workspace to meet the needs of the Council’s Industrial Strategy and a new publicly accessible garden square”.
Do go and look at the exhibition – as always, keep an eye out for height and density, and check to see if the fine view of the unique Ark is still retained as one approaches Hammersmith.
Update – we wrote this letter of objection in March 2019, the application was subsequently withdrawn in October 2019 before reaching the planning committee. We understand a revised application will be submitted in due course, on which we will report.
On Thursday 4th Oct all the organisations presenting a legal challenge to Heathrow expansion will be in court seeking permission to go ahead.
H&F Council have now joined 4 other Councils to challenge the Heathrow decision. Friends of the Earth are challenging it on climate change grounds, and Greenpeace on grounds of air pollution.
The judge will decide which, if any of challenges, can proceed to a full hearing. The campaign needs a big crowd inside and outside the court to show public opposition. The permission hearings will be at the Royal Courts of Justice, if you support the challenge and can attend, please be there by 9 am.
For those in any doubt as to what 3rd runway traffic might look like, this is what TEAM landing patterns already look like at 6.30 am on a Sunday morning even when the alternation schedule plans to only use the southern runway! See this link for the current alternation schedule and an understanding of the carte-blanche that is TEAM.
Continued →
You may well be aware that the Government published a document on 5th June which would effectively give outline planning permission for a third runway at Heathrow. Parliament will vote on this in next 2 1/2 weeks. As the Hammersmith Society has said repeatedly, a third runway would have significant negative effects on Hammersmith: increased noise (with the health impacts that brings) from more flights and a new flightpath, increased pollution from more traffic on the A4 and A40 through the Borough, and vastly increased pressure on public transport infrastructure going into and out of central London. If you share these concerns, do email or write, as soon as possible, to your MP who for most of us is Andy Slaughter (), and the Minister for Transport
The Chair of the H&F Resident-Led Commission on Airport Expansion, Christina Smyth, has written the following blogpost on the Council’s website:
Continued →
Members of the Committee visited this year’s nominations on Sunday 20th May and shortlisted them. They are all shown on the nominations page with just a selection here. If you would like to comment on them, or make suggestions for winners, please use the comment form on the nominations page.
Award winners will be announced at the AGM in the Bush Theatre on 5th July.
Members, guests, and friends will be warmly welcomed.
This slideshow requires JavaScript.
The planning application for the Town Hall development has been lodged, and is available on the council’s planning portal, with listed building consent application here. A good starting point is the Design & Access Statement. Summary details are also now available on the council website if you don’t have time to go through all 488 planning documents!
There are a number of design developments: the addition of a brise soleil over the substantial roof extension, and a slight modification of the King Street/cinema frontage following comments by ourselves and others. The Committee will be studying the application carefully. The slide show above shows the main CGI images published with the plans.
We would be pleased to hear your feedback.
One news item from each selected source – more on our Local and Affiliate news page. Subscribe to our weekly highlights
©2024, The Hammersmith Society | Privacy | Contact | Join | @ Subscribe | ⓘ
Campaigning for over sixty years